Projects
Sports facilities
Goals and objectives have been reached as an independent construction consultancy without any form of corporate support...
City Stadium, Bialystok, Poland
The body of this football stadium incorporates a full size playfield, spectators' area for 22.5 thousand people and the full functional programme required to perform a football game. The spectators' area and closed rooms are designed as monolithic concrete structure. A light teflon membrane will span over the steel structure of the roof protecting the spectators' area. The roof structure will also serve as support for lighting system, PA system and security cameras. GerPlan company supported the contractors of HVAC and electrical installations in the work commencement process. GerPlan was involved in verification of the stadium design to eliminate incorrect solutions which might threaten the smooth execution of the works conducted by the contractor. There was also a claim process instituted towards the investor aimed at the elimination of the documentation defects.
cmT scope of services:
- Analysis of the contract documentation, the project design and the construction site problems, and the subsequent preparation of an expert opinion regarding delays to the construction time schedule and on the obstacles caused by the Investor
05 - 06. 2011
PLN 156 mln
-
Sport Centre